Please click on thumbnails for a bigger view.

Dike and Drainage
The dike & drainage system for phase 1 is 100% completed. This dike & drainage system is introduced to the infrastructure project in Cambodia for the first time.

Dike and Drainage Dike and Drainage Dike and Drainage

Dry Port
To support import / export activities, PPSEZ has made contract with an experienced logistic company in Singapore named Bok Seng Logistics to develop a vast dry port and logistics hub covered 10Ha of land. Currently the dry port is completed and under operation.

Dry Port Dry Port Dry Port  

Power Station
PPSEZ generates its own electricity through a joint venture with Colben System Pte Ltd. from Singapore. Currently the power station is 100% completed and under operation to sell electricity to Electricite du Cambodge (EDC) as well.

Power Station Power Station Power Station  

Water Supply
PPSEZ has its own water supply system and the construction is 100% completed. Supply capacity for phase 1 is 5,300m3 per day.

Water supply Water Supply Water Supply  

Waste Water Treatment
PPSEZ has waste water treatment plant to protect the environment. Waste water from industrial or commercial activities shall be treated prior to its release into the environment or its re-use.

Waste Water Waste Water Waste Water  
© Copyright 2007 PPSEZ. All rights reserved.
Iconic Studio